CHALLENGE:
​
A Fortune-50 technology company required continuous, high-capacity clean power to support a multi-week outdoor activation, including:
​
-
Film Style Basecamp for Crew
-
Lighting arrays for nighttime operation
-
Event production equipment & broadcast support
-
Level-2 EV charging operations for on-site vehicles & test drive demos
-
Crew check in and registration areas with laptops, tablets, lighting and multiple 10 ton air conditioning.

SOLUTION:
Saniset Fleet deployed a Solar-Powered CleanGen J250, integrated with a closed-loop modular solar farm, enabling solar generation to recharge the battery during the day, extending operational autonomy without fuel or grid dependency.
​
-
The system was sized to meet:
-
Average daily load 200 kWh/day
-
Average Daily Solar Production 200 kWh
THE IMPACT
​
-
5,600 kWh of onsite solar generation fed directly into battery storage
-
9.96 metric tons of CO2 avoided
-
1,120 gallons of diesel displaced
-
100% uptime with zero outages or restarts
-
Zero noise, zero fumes, zero refueling
-
Demonstrated ability to scale corporate sustainability